Patio / Shed Base Calculator
Calculate crushed stone for patio sub-base, shed pads, and equipment pads.
ft
ft
inches
4" typical, 6" for heavy loads
(10+1)ft × (10+1)ft × 4" depth + 15% compaction = 2.0 yd
3/4" Crushed Bluestone
2.0 cubic yards
$176.00
Material total$176.00
+ delivery fee and tax calculated at checkout
4" of compacted 3/4 crushed stone is standard for shed pads and patio bases. Add 6" edge buffer for a stable perimeter.
Recommended Products
Project Tips
A proper base is 4 inches of compacted 3/4 crushed stone with a 6-inch edge buffer on all sides. Compact in 2-inch lifts with a plate compactor. Add 1 inch of screenings or sand on top as a leveling layer before placing the shed or pavers.
FAQ
Want us to install it?
Our crew handles the full job — materials from our yard.
